Kishorn Port and Dry Dock is the former construction site of the Ninian Central Platform, the site has 45 Hectares of land available (including the dry dock) for immediate construction and development with a further 19 Hectares available.

All Energy Banner II

Visit us on Stand HIE29 at ALL-ENERGY 2015, Glasgow

Kishorn Port Ltd will again be returning to exhibit at the All-Energy Exhibition and Conference, which showcases a full variety of renewable and sustainable technologies.  All-Energy will take place, for the first time, at the SECC on Wednesday 6th May 8:30 – 18:00 and Thursday 7th May 8:30 – 17:00.

KPL will promote its suitability and its industry expertise within the energy sectors and the pending decommissioning market, and demonstrate that all types of equipment can be trialled and constructed in low risk conditions within one of Europe’s largest Dry Docks.

On site at KPL, there are established quarry and port facilities, shipping agency, stevedoring, craneage and transport facilities with self-discharge work vessels available making it an ideal environment for trials and testing.

Information will also be available on ongoing ground-breaking trials at KPL for example, the wave energy company Albatern, as well as the world renowned Ninian Central Platform, which was constructed in the Dry Dock during the late 1970’s. The Ninian Central Platform is the second largest manmade object ever to be moved across the surface of the earth at 600,000 tonnes in total.

Directors Alasdair Ferguson and Simon Russell from KPL will be at stand HIE29 at All Energy, as well as the marketing and business team Colleen MacLean and Kirsty Morrison.

KPL looks forward to networking with you and key contacts in various sectors throughout the event, which is free to attend.

If you would like to organise a meeting with one of the team at All-Energy, please get in touch on +44 (0) 1397 773 840 or enquiries@kishornportltd.com