Kishorn Port and Dry Dock is the former construction site of the Ninian Central Platform, the site has 45 Hectares of land available (including the dry dock) for immediate construction and development with a further 19 Hectares available.

April 2017

Floating Wind Farm to create up to 200 jobs at Kishorn Port

Kishorn Dry Dock will come out of a 23 year long hibernation after an agreement was signed today to use the site during the construction of the world’s largest floating wind farm.

Dry Dock Begins Pumping Out

Pumping out of the Dry Dock has begun.

Kishorn Port Dry Dock Refurbishment – Update

Things are moving forward with the Kishorn Port Dry Dock refurbishment works.