Kishorn Port and Dry Dock is the former construction site of the Ninian Central Platform, the site has 45 Hectares of land available (including the dry dock) for immediate construction and development with a further 19 Hectares available.

June 2017

Kishorn Port Dry Dock Time Lapse

Time lapse footage was filmed during the process of refurbishment and pumping out and is now available to view.