Kishorn Port and Dry Dock is the former construction site of the Ninian Central Platform, the site has 45 Hectares of land available (including the dry dock) for immediate construction and development with a further 19 Hectares available.

Skye Bridge

In the 1990’s, the caissons for the Skye Bridge were made in the Kishorn dry dock. This was the last use for the dry dock until Leiths and Ferguson Transport formed Kishorn Port Ltd in 2008. The caissons each weighed 2300 tonnes.

Skye Bridge Caisson Inaugural Pour

Skye Bridge Caisson Inaugural Pour

Skye Bridge

Skye Bridge

 

More Information in this Section: